The team at Effinity Solutions was responsible to manage a group of technicians to inspect and repair the generator. Performed hi-pot test by creating magnetic field and heating the stator to look for and repair the hot spot.
Maintenance of 120 MW Power Plant (CT), Power And Light Houston Texas, 1978